3) Load Test

  • Load testing is completed on all overhauled drives and fluid couplings.
  • Our control system can test different styles of power transmission gearboxes to simulate
    exact operating conditions onsite.
  • Ability to test gearboxes from 10kW to 3500kW and ratios from 5:1 to 900:1
  • Load test data is logged in 1-second intervals and a report is created containing
    information on temperatures, power and speed figures.
  • Graphs and visuals are created and compiled into a formal report for customer.